
Content
• Additive Technique and Mock-Up
• BPR Indications and Classifications
for Anterior teeth
• Biological Considerations between
Horizontal/Vertical Marginal Design
• Material Selection in the Adhesive Realm
• Preparation Instrumentation and Design
• Substrate Optimization via Immediate
Dentin Sealing (IDS)
• BPR Bonding Techniques
• BPR Indications and Classifications
for Posterior teeth
• Biological Considerations between Horizontal/
Vertical Marginal Design
• Cuspal Coverage; By Choice or by Chance?
• Parametric preparation
• Deep Margin Elevation Technique
• Endo/Restorative Post or not to Post? A Modern Conundrum
• Anatomical Functional Compass
Hands_on
• Mock-Up Transferand Silicone
Preparation Matrices (Guides)
• Veneer Preparation: 12/11/21/22
• Veneer Cementation: 11
• Vertical Crown Preparation: 21
• Preparation: 36 Overlay
• Cementation: 36 Cementation of Onlay
• Vertical Preparation 36
Modification from Chamfer
• Fabrication of provisional on 36